Skip to contentSkip to sidebarSkip to footer
IESCON
  • Home
  • About
    • Our Story
    • Our Team
    • Our Process
    • Our Facility
  • Services
    • API Tank Construction
    • EPC & Turnkey Projects
    • ASME Pressure Vessel Fabrication
    • Heavy Steel Structure Fabrication
    • Marine & Defense Engineering
    • Maintenance & Project Recovery
  • Industries
    • OIL & GAS – PETROCHEMICALS
    • INFRASTRUCTURE & POWER
    • MARINE & DEFENSE
  • Blog
  • Portfolio
  • Clients
  • Contact
IESCON
IESCON
IESCON

All Portfolio items

IESCON Close
  • Home
  • About
    • Our Story
    • Our Team
    • Our Process
    • Our Facility
  • Services
    • API Tank Construction
    • EPC & Turnkey Projects
    • ASME Pressure Vessel Fabrication
    • Heavy Steel Structure Fabrication
    • Marine & Defense Engineering
    • Maintenance & Project Recovery
  • Industries
    • OIL & GAS – PETROCHEMICALS
    • INFRASTRUCTURE & POWER
    • MARINE & DEFENSE
  • Blog
  • Portfolio
  • Clients
  • Contact
facebook-1twitter-xtik-tokinstagram
ExxonMobil
Main Portfolio
INTERDYNE – USA
Nile Sugar Co
NWC – Saudi Water Company
SMS – Germany
OPSBA Oil Lubricant LOPP – Total
Thermo Engineering – ITALY
Steel Tanks Fabrication and Welding – HAC
Jet Blasting and Painting Storage Tanks – EMC
Main Portfolio
TBM Displacement Frame
STP TANKS – Orascom Construction JV
AFC Ammonia Planet I – New Cooling tower
Main Portfolio

Recent Posts

  • Plate Rolling, Heavy Machining, and Dimensional Control in Industrial Fabrication
  • heavy metal steel
  • Custom Pressure Vessel Fabrication vs Standard Equipment: When Is Custom Worth It?
  • hydro test of pressure vessel and Documentation: A Practical Project Guide
  • Pressure Vessel Welding & NDT: What Procurement Teams Should Ask For

Recent Comments

  1. Pressure Vessel Design Basis: Pressure, Temperature, Materials, and Process Conditions on How to Prequalify an Industrial Fabrication and EPC Contractor
  2. What Should an RFQ for ASME Pressure Vessel Fabrication Include? on Local Fabrication vs Imported Components in Egypt: How Project Teams Should Decide
  3. What Should an RFQ for ASME Pressure Vessel Fabrication Include? on engineering procurement and construction contract 2026 | IESCON
  4. steel supply chain 2026 | IESCON: Hidden Risks Revealed on API 650 vs API 620: Which Storage Tank Standard Fits Your Project?
  5. steel supply chain 2026 | IESCON: Hidden Risks Revealed on Storage Tank Fabrication: From Design Basis to Erection and Testing

IESCON: International Engineering Services & Contracting Company

Address

354 Taqseem Smouha – Abu Qir Fertilizers Building – Alexandria – Egypt.

Company
  • Story
  • Team
  • Facility
  • Process
Explore
  • FAQs
  • Request
  • Our Blog
  • Privacy
Socials

facebock

Say Hello

info@iescon.com

+2 03 4269584

+20 122 480 3319

IESCON © 2026. All Rights Reserved.

This site uses functional cookies and external scripts to improve your experience.

Privacy settings

Privacy Settings

This site uses functional cookies and external scripts to improve your experience. Which cookies and scripts are used and how they impact your visit is specified on the left. You may change your settings at any time. Your choices will not impact your visit.

NOTE: These settings will only apply to the browser and device you are currently using.

Cookies Policy

Powered by Cookie Information